Skip to main content

CAPP Project Information

Project Maps and Facilities

CVWD’s existing groundwater production wells would be used to extract the purified water back out of the groundwater basin for use in the drinking water supply.

  • An Advanced Water Purification Facility (AWPF)
  • 10-inch pipeline to deliver the purifed water
  • Two groundwater injection wells
  • Two new monitoring clusters
Map with pipelines and wells: shows AWP facilities, injection/monitoring wells, and pipelines overlaid on a satellite city view.

Reports and Studies

Project Design and Engineering 

Coming Soon

Join our mailing list